A. The "See It to Believe It" Philosophy:
- We understand that theoretical numbers are only truly valuable when verified through actual operation at your own business.
- The trial program is designed to demonstrate the ability to eliminate wasted heat, helping customers see clear savings on each billing cycle.
B. '3 Billing Cycles' Experience Policy:
- Format: Customers have the equipment installed and used for3 consecutive billing cycles before making an official purchase decision.
- Contract Template: The process is legalized through a transparent and clear 3-month trial contract template.
- Financial Terms: To ensure mutual commitment, the customer pays a deposit of70% of the equipment value based on the reference framework of the ESCO package.
C. 2026 Production Batch Privileges:
- Launch Date: The program officially launches on15/06/2026.
- Limited Quantity: To ensure the best quality of technical support, we only apply trials for12 MAT M120 machines (100% brand new, belonging to the 2026 production batch).
- Availability: The program will end as soon as the quota of test machines is fully registered.
D. Transparent & Independent Measurement System:
- Specialized Equipment: All thermal energy and efficiency measurement results are compared usingHioki measuring instruments (Japan) - a line of specialized measuring equipment recognized by the electricity sector of Vietnam.
- Additional Features: In particular, our testing equipment integrates a Vietnamese interface and function"electricity theft detection", helping businesses comprehensively control their energy systems.
- Objective Verification: Results are also supported by independent measurements fromLong An Electrical Testing Center (TCVN) to ensure the highest objectivity.
E. Simple 5-Step Registration Process:
- Contact: Registerhere.
- Survey: Engineers perform field assessment at the site (3-phase 5-wire power grid, 0.4 KV).
- Signing: Complete the trial contract and deposit as stipulated.
- Installation: Install the MAT M120 machine into the system.
- Verification: Monitor and verify performance after 3 months to decide on long-term investment.